
{"id":13103,"date":"2023-06-26T15:43:52","date_gmt":"2023-06-26T09:13:52","guid":{"rendered":"https:\/\/www.moenr.gov.bt\/?p=13103"},"modified":"2023-07-05T11:10:06","modified_gmt":"2023-07-05T04:40:06","slug":"contract-signing-for-design-supply-and-installation-of-17-38-mw-sephu-solar-pv-power-project","status":"publish","type":"post","link":"https:\/\/www.moenr.gov.bt\/?p=13103","title":{"rendered":"Contract signing for Design, Supply and Installation of 17.38 MW Sephu Solar \u201cPV\u201d Power Project"},"content":{"rendered":"<p>Sephu Solar Power Project will be the first utility scale solar power plant to be constructed in the<br \/>\ncountry. The project will be implemented by the Department of Energy, Ministry of Energy and Natural<br \/>\nResources. The project is being financed by the Asian Development Bank and is expected to be<br \/>\ncommissioned by December 2024.<br \/>\nThe contract for Design, Supply and Installation of Sephu Solar \u201cPV\u201d Power Plant is awarded to M\/s<br \/>\nRigsar Construction Pvt. Ltd, Bhutan (JV with PES Engineers Pvt. Ltd, India). A simple contract signing<br \/>\nceremony between the Department of Energy, MoENR and M\/s Rigsar Construction Pvt. Ltd. was held<br \/>\non 20 th June 2024.<br \/>\n17.38 MW Sephu solar power project will generate at least 25 million units of energy annually and will<br \/>\ngo a long way in ensuring energy security for economic development and prosperity of the people of<br \/>\nBhutan.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13105\" src=\"https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing3.jpg\" alt=\"\" width=\"563\" height=\"443\" srcset=\"https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing3.jpg 563w, https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing3-300x236.jpg 300w, https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing3-381x300.jpg 381w\" sizes=\"auto, (max-width: 563px) 100vw, 563px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13104\" src=\"https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing.jpg\" alt=\"\" width=\"685\" height=\"466\" srcset=\"https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing.jpg 685w, https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing-300x204.jpg 300w, https:\/\/www.moenr.gov.bt\/wp-content\/uploads\/2023\/06\/contract-signing-400x272.jpg 400w\" sizes=\"auto, (max-width: 685px) 100vw, 685px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sephu Solar Power Project will be the first utility scale solar power plant to be constructed in the country. The project will be implemented by the Department of Energy, Ministry of Energy and Natural Resources. The project is being financed by the Asian Development Bank and is expected to be commissioned by December 2024. The [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":13106,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-13103","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"_links":{"self":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts\/13103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13103"}],"version-history":[{"count":4,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts\/13103\/revisions"}],"predecessor-version":[{"id":13120,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts\/13103\/revisions\/13120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/media\/13106"}],"wp:attachment":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}