
{"id":8738,"date":"2020-02-18T10:34:05","date_gmt":"2020-02-18T04:04:05","guid":{"rendered":"https:\/\/www.moea.gov.bt\/?p=8738"},"modified":"2020-02-19T09:57:43","modified_gmt":"2020-02-19T03:27:43","slug":"selected-candidates-for-the-post-of-project-engineer-project-manager","status":"publish","type":"post","link":"https:\/\/www.moenr.gov.bt\/?p=8738","title":{"rendered":"Selected Candidates for the post of Project Engineer &amp; Project Manager"},"content":{"rendered":"<p><span style=\"font-weight: 400\">The Ministry of Economic Affairs, Thimphu is pleased to announce the selection results for\u00a0 the post of Project Engineer (P3 A) &amp; Project Manager (P3 A) on contract for Department of Industry conducted on 10th February 2020 as detailed below:\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/www.moea.gov.bt\/wp-content\/uploads\/2020\/02\/Selected-Candidates.pdf\">Selected Candidates<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Economic Affairs, Thimphu is pleased to announce the selection results for\u00a0 the post of Project Engineer (P3 A) &amp; Project Manager (P3 A) on contract for Department of Industry conducted on 10th February 2020 as detailed below:\u00a0 Selected Candidates<\/p>\n","protected":false},"author":21,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-8738","post","type-post","status-publish","format-standard","hentry","category-vacancy"],"_links":{"self":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts\/8738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8738"}],"version-history":[{"count":1,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts\/8738\/revisions"}],"predecessor-version":[{"id":8740,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=\/wp\/v2\/posts\/8738\/revisions\/8740"}],"wp:attachment":[{"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.moenr.gov.bt\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}